Skip to content
  • Categories
Collapse

The Silver Fern

  • Tipping
  • Team Sheets
  • Highlights
  • Results
    • All Blacks

      Search every All Blacks Test. Filter results by year, opposition, location, venue, city and RWC stage

    • Super Rugby

      Search every Super Rugby since match 1996

    • NPC

      Search NPC results. Only first division matches from 1976-2005. All results from the 14 team competition (2006-present) are included

Stadium of Canterbury

Scheduled Pinned Locked Moved Sports Talk
canterburycrusaders
813 Posts 67 Posters 46.6k Views 2 Watching
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • HoorooH Offline
    HoorooH Offline
    Hooroo
    wrote on last edited by
    #771

    Decision day happening at the moment.

    I hope @shark is there supporting the cause (or what’s left of it)

    It will be a disgrace if they don’t go ahead

    KiwiwombleK 1 Reply Last reply
    0
    • HoorooH Hooroo

      Decision day happening at the moment.

      I hope @shark is there supporting the cause (or what’s left of it)

      It will be a disgrace if they don’t go ahead

      KiwiwombleK Online
      KiwiwombleK Online
      Kiwiwomble
      wrote on last edited by
      #772

      @Hooroo isn't it decided? i thought they'd agreed the new contract

      HoorooH 1 Reply Last reply
      1
      • KiwiwombleK Kiwiwomble

        @Hooroo isn't it decided? i thought they'd agreed the new contract

        HoorooH Offline
        HoorooH Offline
        Hooroo
        wrote on last edited by Hooroo
        #773

        @Kiwiwomble said in Stadium of Canterbury:

        @Hooroo isn't it decided? i thought they'd agreed the new contract

        Nah. They are deciding today. It’s live on stuff.

        Non binery folk aren’t supportive, it appears. (This was in the submission a few moments ago)

        gt12G 1 Reply Last reply
        0
        • HoorooH Hooroo

          @Kiwiwomble said in Stadium of Canterbury:

          @Hooroo isn't it decided? i thought they'd agreed the new contract

          Nah. They are deciding today. It’s live on stuff.

          Non binery folk aren’t supportive, it appears. (This was in the submission a few moments ago)

          gt12G Offline
          gt12G Offline
          gt12
          wrote on last edited by gt12
          #774

          @Hooroo said in Stadium of Canterbury:

          @Kiwiwomble said in Stadium of Canterbury:

          @Hooroo isn't it decided? i thought they'd agreed the new contract

          Nah. They are deciding today. It’s live on stuff.

          Non binery folk aren’t supportive, it appears. (This was in the submission a few moments ago)

          Interesting, you'd think that they wouldn't assume it as a yes / no distinction.

          1 Reply Last reply
          2
          • HoorooH Offline
            HoorooH Offline
            Hooroo
            wrote on last edited by
            #775

            Council voted 13:3 in favour of spending the “fixed” $683m

            Yay. Build the damn thing

            1 Reply Last reply
            3
            • StargazerS Offline
              StargazerS Offline
              Stargazer
              wrote on last edited by
              #776

              https://twitter.com/ChristchurchCC/status/1547423363923992576

              1 Reply Last reply
              0
              • nzzpN Offline
                nzzpN Offline
                nzzp
                wrote on last edited by
                #777

                That is a tremendous entertainment and terrible financial decision.

                KiwiwombleK 1 Reply Last reply
                0
                • nzzpN nzzp

                  That is a tremendous entertainment and terrible financial decision.

                  KiwiwombleK Online
                  KiwiwombleK Online
                  Kiwiwomble
                  wrote on last edited by
                  #778

                  @nzzp yeah...i imagine this thread will keep running with lots of things to talk about during construction

                  1 Reply Last reply
                  0
                  • StargazerS Offline
                    StargazerS Offline
                    Stargazer
                    wrote on last edited by
                    #779

                    https://twitter.com/NZStuff/status/1614654975229190146

                    1 Reply Last reply
                    1
                    • taniwharugbyT taniwharugby

                      who would take on a fixed price contract in the current climate, unless your price is way above market?

                      Sure you price in contingencies, but the world be crazy and prices escalating, and the time frames involved here...

                      https://www.stuff.co.nz/national/129249542/fixedprice-contract-negotiated-for-christchurch-stadium

                      M Offline
                      M Offline
                      Mackerzzzz
                      wrote on last edited by
                      #780

                      @taniwharugby said in Stadium of Canterbury:

                      who would take on a fixed price contract in the current climate, unless your price is way above market?

                      Sure you price in contingencies, but the world be crazy and prices escalating, and the time frames involved here...

                      https://www.stuff.co.nz/national/129249542/fixedprice-contract-negotiated-for-christchurch-stadium

                      From a business perspective that's the most stupid decision I have ever seen. If another price hike hits you have basically garenteed that your business is going down the drain. And at best the building company has garenteed that they won't make money on the job.

                      KiwiwombleK 1 Reply Last reply
                      0
                      • M Mackerzzzz

                        @taniwharugby said in Stadium of Canterbury:

                        who would take on a fixed price contract in the current climate, unless your price is way above market?

                        Sure you price in contingencies, but the world be crazy and prices escalating, and the time frames involved here...

                        https://www.stuff.co.nz/national/129249542/fixedprice-contract-negotiated-for-christchurch-stadium

                        From a business perspective that's the most stupid decision I have ever seen. If another price hike hits you have basically garenteed that your business is going down the drain. And at best the building company has garenteed that they won't make money on the job.

                        KiwiwombleK Online
                        KiwiwombleK Online
                        Kiwiwomble
                        wrote on last edited by
                        #781

                        @Mackerzzzz thats not true, they have not guaranteed they wont make any money, they made the deal at the tail of covid when shipping materials was the hardest, lots to suggest they will become easier to source....and they will have hiked a huge premium onto the price to be locked in....the construction company is the last one im worried about

                        1 Reply Last reply
                        1
                        • KiwiwombleK Online
                          KiwiwombleK Online
                          Kiwiwomble
                          wrote on last edited by
                          #782

                          https://newsline.ccc.govt.nz/news/story/major-concrete-pours-for-te-kaha-to-begin-later-this-month

                          https://www.te-kaha.co.nz/

                          thought there might be some webcams or something but couldn't see any, regularly checked in on the webcams for Forsyth Barr

                          antipodeanA dogmeatD 2 Replies Last reply
                          1
                          • KiwiwombleK Kiwiwomble

                            https://newsline.ccc.govt.nz/news/story/major-concrete-pours-for-te-kaha-to-begin-later-this-month

                            https://www.te-kaha.co.nz/

                            thought there might be some webcams or something but couldn't see any, regularly checked in on the webcams for Forsyth Barr

                            antipodeanA Online
                            antipodeanA Online
                            antipodean
                            wrote on last edited by
                            #783

                            @Kiwiwomble I'm astonished they're actually commencing work on this.

                            KiwiwombleK 1 Reply Last reply
                            1
                            • antipodeanA antipodean

                              @Kiwiwomble I'm astonished they're actually commencing work on this.

                              KiwiwombleK Online
                              KiwiwombleK Online
                              Kiwiwomble
                              wrote on last edited by
                              #784

                              @antipodean said in Stadium of Canterbury:

                              @Kiwiwomble I'm astonished they're actually commencing work on this.

                              doesn't seem like a cracking pace considering it was signed off in July last year

                              1 Reply Last reply
                              0
                              • KiwiwombleK Kiwiwomble

                                https://newsline.ccc.govt.nz/news/story/major-concrete-pours-for-te-kaha-to-begin-later-this-month

                                https://www.te-kaha.co.nz/

                                thought there might be some webcams or something but couldn't see any, regularly checked in on the webcams for Forsyth Barr

                                dogmeatD Offline
                                dogmeatD Offline
                                dogmeat
                                wrote on last edited by
                                #785

                                @Kiwiwomble

                                Artist's impression, subject to design development
                                
                                KiwiwombleK 1 Reply Last reply
                                0
                                • dogmeatD dogmeat

                                  @Kiwiwomble

                                  Artist's impression, subject to design development
                                  
                                  KiwiwombleK Online
                                  KiwiwombleK Online
                                  Kiwiwomble
                                  wrote on last edited by
                                  #786

                                  @dogmeat ?

                                  dogmeatD 1 Reply Last reply
                                  0
                                  • KiwiwombleK Kiwiwomble

                                    @dogmeat ?

                                    dogmeatD Offline
                                    dogmeatD Offline
                                    dogmeat
                                    wrote on last edited by
                                    #787

                                    @Kiwiwomble All the renders of the stadium have that caveat attached.

                                    Pretty pictures mean SFA once the value engineers get their mitts on a design.

                                    KiwiwombleK 1 Reply Last reply
                                    0
                                    • dogmeatD dogmeat

                                      @Kiwiwomble All the renders of the stadium have that caveat attached.

                                      Pretty pictures mean SFA once the value engineers get their mitts on a design.

                                      KiwiwombleK Online
                                      KiwiwombleK Online
                                      Kiwiwomble
                                      wrote on last edited by Kiwiwomble
                                      #788

                                      @dogmeat ok, just confirming the context, you referring to my comment on the progress? as in they may have gone back to the drawing board? ture in principle but to reliably submit a tender price (especially a fixed price) they will have had to be more than 80-90% reference design (if not well into detail design), meaning the things outstanding will be the door handles and paint colour

                                      1 Reply Last reply
                                      0
                                      • StargazerS Offline
                                        StargazerS Offline
                                        Stargazer
                                        wrote on last edited by
                                        #789

                                        Didn't they have problems getting rid of one particular building on the site, because the owners refused to sell? Or was that longer ago? This has been going on for so long, that I've trouble with the time line.

                                        KiwiwombleK 1 Reply Last reply
                                        1
                                        • StargazerS Stargazer

                                          Didn't they have problems getting rid of one particular building on the site, because the owners refused to sell? Or was that longer ago? This has been going on for so long, that I've trouble with the time line.

                                          KiwiwombleK Online
                                          KiwiwombleK Online
                                          Kiwiwomble
                                          wrote on last edited by
                                          #790

                                          @Stargazer definitely been dragging, my understanding as the propoerty issues were sorted a while ago, only build left on that whole block last time i was in chch a few years ago is the pump station and theyre building around that

                                          1 Reply Last reply
                                          0
                                          Reply
                                          • Reply as topic
                                          Log in to reply
                                          • Oldest to Newest
                                          • Newest to Oldest
                                          • Most Votes


                                          • Login

                                          • Don't have an account? Register

                                          • Search
                                          • First post
                                            Last post
                                          0
                                          • Categories
                                          • Search